Reject Condenser

$ 799.99

Be faster and maintain processing speed. 

For those running a hot-pass technique, the reject condenser sits between the vigreux column and the vacuum take-off. Designed to maximize speed with any back up in the cold trap. 

• Help the cold trap from clogging

• Maintain Speed During hot pass run without overloading the cold trap

• Recommended temperature: 10°-30°C

• Ball joint/socket design reduces the tension at the joints

• Adaptable to current modular path model

Details
• (2) 1" BP to 35/25 Ball Joint PTFE Adapter
• (2) Stainless Steel Pinch Clamp with Lock Nut (5L)
• (1) 3 Prong Clamp
• (1) Boss Head Clamp
• (2) 10ft Silicone Hoses 
• Chiller may be needed if Hot Pass kit is not purchased
3 in stock